New swimming pool: VSU has chosen a contractor

8 Views

A construction company OOO “Kupets” is to build a swimming pool for students and academic staff of the university.

Preparatory work is currently underway. A pool of total size of 400 sq. meters will have five lanes of variable depth from 1.2 to 1.8 meters. The sports facility will be located on the premises of VSU agro-bio-station. The construction of the pool will be finished by the end of 2022.